MacKintosh Hawthorne Ridge

Complete turnkey site work for 46 new homes in the Mackintosh subdivision of Burlington on a 25-acre parcel consisting of grading, rock excavation, drainage, utilities and paving. This is one of many subdivisions that we have completed since the birth of the community in the early 2000's.

Location: Burlington, NC

Bee-Safe Storage

Complete turnkey site work, including: demolition, grading, drainage, utilities and paving; resulting in a conveniently located 3-story self-storage and wine storage facility in South Burlington. 

Location: Burlington, NC

Croasdaile Village, Phases I & II

Complete turnkey site work in an existing retirement community in Durham for the addition of 17 new cottages, 4 new six-plex villas, 18 memory care suites, an assisted living center, new guardhouse with entrance, amenity center, maintenance building, prayer garden and numerous parking lots spread over 25 acres consisting of clearing, grading, thousands of feet of new drainage and utilities, a permanent pond, retaining walls and paving.

Location: Durham, NC

Interstate 20/Hwy 15-501 Bridge Repair

Complete removal and replacement of existing bridge decks on I-20 over Highway 15-501 in Bishopville, SC; being done in three phases under live traffic for the coordination of hurricane season emergency evacuations, should they be needed.

Location: Bishopville, SC

LIDL Grocery & University Retail

Complete turnkey site work for a new grocery store and retail parcels in South Burlington, including clearing, grading, drainage, utilities, sidewalk, paving and offsite improvements including a turning lane and signal work.

Location: Burlington, NC

Waterside Apartments, Phase II 

Complete turnkey site work for 9 new apartment buildings on a 10-acre site just off of I-85/I-40 in Graham, including clearing, grading, a permanent pond, retaining walls, drainage, utilities, paving and offsite improvements. This is the second phase of Watercourse Apartments, which we completed two years ago, neighboring this site.

Location: Graham, NC

Carver Street Extension

Over one mile of new roadway connecting Danube Lane with Old Oxford Highway in Durham, consisting of grading, storm drains, permanent basins, landscaping, signals, sidewalks and pavement.

Location: Durham, NC

Market Street Improvements
 

Intersection improvements at Guilford College Road and Market Street in Western Greensboro under live traffic - including grading, drainage, utilities, signals, landscaping and paving.

Location: Greensboro, NC

All-In Mini Storage
 

Complete turnkey site work for new storage units in Western Greensboro - including clearing, grading, drainage, utilities and paving.

Location: Greensboro, NC

Lovett Street Sidewalks
 

Constructing over 1,800 SY of sidewalk including curb, steps and ramps along both sides of Lovett Street, from Freeman Mill Road to Florida Street, under live traffic in a residential region of Central Greensboro.

Location: Greensboro, NC

Badcock Warehouse Expansion
 

Complete turnkey site work for the 175,000 SF expansion of an existing distribution center in Mebane consisting of 100,000 CY of borrow, installation of two large detention systems, clearing, drainage, utilities and paving.

Location: Mebane, NC

Kia of Burlington
 

Complete turnkey site work for the construction of a new car dealership, including mobilization, grading, retaining wall, storm drains, utilities, paving, and road work.

Location: Burlington, NC

Byrdsville DG00302
 

New roadway in Hillsborough for re-routing of existing residential street to eliminate a railroad crossing, consisting of grading, culvert construction, drainage, utilities and paving.

Location: Hillsborough, NC

Barbee Road/Herndon Road DE00173
 

Construction of roundabout at existing intersection of Barbee Road and Herndon Road in South Durham, consisting of grading, drainage, utilities, sidewalk and paving.

Location: Durham, NC

Triangle 54
 

Complete turnkey site work for a 20-acre site in South Durham consisting of milling existing asphalt parking lot, grading, storm drain, utilities, sidewalk, paving and offsite improvements.  This is phase one of three total phases.

Location: Durham, NC

Six Forks Road/Falls of Neuse DE00155
 

Installation of six bio-retention basins in the medians of the ramps of Six Forks Road and Falls of Neuse Road on I-540 in North Raleigh under heavy traffic conditions and strict time restrictions.

Location: Raleigh, NC

Corners at Brier Creek
 

Complete turnkey site work for the addition of two retail buildings in an existing and active shopping center in North Raleigh, consisting of demolition, grading, drainage, utilities and paving.

Location: Raleigh, NC

Smith Farms, Phase II
 

Complete turnkey site work for the development of the second phase of a large subdivision in Apex on a 30-acre site, including clearing, bridge installation, grading, drainage, utilities, construction of a sewer outfall, sidewalk and paving.

Location: Apex, NC

Graham Manor
 

Complete turnkey site work for a new retirement center in Graham, consisting of clearing, grading, drainage, retaining walls, utilities, sidewalk and paving.

Location: Graham, NC

Western Guilford Middle School
 

Grading and storm drain for a replacement school in Greensboro on a 20 acre site, including sports fields, a permanent pond and over 100,000 cubic yards of dirt.  Phase 1 is complete which allowed the new school to open and the old school to be demolished. Phase 2 consists of the sports fields and other amenities, and is currently underway.

Location: Greensboro, NC

Senator Ralph Scott Grading
 

Major erosion control and grading package on a 50 acre site for a shell warehouse for Windsor Commercial for later development.

Location: Mebane, NC

NCCP2
 

Complete sitework for shell warehouse that we are building for Samet, across the street from the Walmart distribution center. This is approximately a 16 acre site.

Location: Mebane, NC

Carraway Village
 

Complete sitework for a mixed use space, offering luxury and convenience to Orange County residents. We are currently on Phase II.

Location: Chapel Hill, NC

Fairfield Inn
 

Complete sitework for construction of Mebane hotel, minutes off I-40.

Location: Mebane, NC

Harden Street Apartments
 

Complete turnkey site work for new apartment buildings just off of I-85/I-40 in Graham, including clearing, grading, drainage, utilities, paving and offsite improvements.

Location: Graham, NC

S. New Hope Road Improvements
 

This NCDOT project consists of the widening and roadway improvements of South New Hope Road in Gastonia. Scope of work includes demolition, clearing, grading, storm drain, traffic control and paving.

Location: Gastonia, NC

I-85/Highway 321 Improvements
 

This multi-year project for the NCDOT in Gastonia consists of the realignment of the intersection of I-85 with Highway 321 under live (and heavy) traffic. Scope of work includes demolition, clearing, grading, rock excavation, storm drain, utilities, bore and jack, multiple culvert installations (precast and cast-in-place), paving and signals. 

Location: Gastonia, NC

Sycamore at Tyvola Luxury Apartments
 

This project consists of turnkey sitework for new apartment homes off of Tyvola Road in the heart of Charlotte. Scope of work includes clearing, grading, storm drain, utilities and paving.

Location: Charlotte, NC